Announcement Date: | 2023-06-07 |
---|---|
Announcement Type: | Drilling Results |
Announcement Code: | JORC |
Company name: | M3 Mining Ltd. |
Project name: | Edjudina |
Location: | Australia |
Commodities: | Gold |
Highlight: | Drilling results incl. 20m at 5.7g/t Au from 24m |
Resources: | only available to subscribers |
CP/QP: | only available to subscribers |
Announcement summary: | M3 Mining Limited (ASX: M3M) (M3 Mining or the Company) is pleased to provide an update on the recently completed Aircore (AC) drilling program at the Edjudina Gold Project (Edjudina or the Project), located in the Eastern Goldfields, approximately 150km northeast of Kalgoorlie, WA. Consisting of 76 holes for 3,456m, the program was designed to test the soil anomalies identified along a splay structure to the major regional Keith-Kilkenny fault which hosts numerous gold occurrences including the historic operating Yilgangie goldfield and the currently operating private Yilgangie Queen mine. These splays host the Jump Up prospect within M3M tenure and successfully intersected significant mineralisation over a thick 20m interval (Figure and Table 1) at the newly named “El Capitan Prospect”. |
Read More |