Announcement Date: | 2023-01-25 |
---|---|
Announcement Type: | Drilling Results |
Announcement Code: | JORC |
Company name: | International Graphite Limited |
Project name: | Springdale |
Location: | Australia |
Commodities: | Graphite |
Highlight: | Drilling results incl. 23m at 9.6% from 10m |
Resources: | only available to subscribers |
CP/QP: | only available to subscribers |
Announcement summary: | The RC holes were spaced north to south to further validate the block modelling of the Springdale Mineral Resource. Figure 2 highlights the location of the drilling. Figures 3 and 4 show cross sections of diamond holes 6, 7 and 12 and RC holes 27, 28 and 29 respectively. Table 1 shows the existing Springdale Mineral Resource Estimate of 15.6Mt @ 6.0% TGC, including a highgrade component of 2.6Mt @ 17.5% TGC. Table 2 and Table 3 detail the locations of the drill holes and significant assay results. All drilling undertaken at Springdale continues to be shallow to a maximum of 100-125 metres with all holes remaining open at depth. Infill drilling will continue at Springdale through February 2023 at which point, following the receipt of assay results |
Read More |