Announcement Date: | 2023-01-23 |
---|---|
Announcement Type: | Pre-Feasibility Study |
Announcement Code: | JORC |
Company name: | New Century Resources Ltd. |
Project name: | Mt Lyell |
Location: | Australia |
Commodities: | Gold,Copper |
Highlight: | Pre-Feasibility Study result incl. Pre Tax NPV (7%) of AUD $560M & IRR of 22% |
Resources: | only available to subscribers |
CP/QP: | only available to subscribers |
Announcement summary: | New Century Resources Limited (ASX: NCZ) (New Century or the Company) is pleased to announce the release of the Mt Lyell Copper Mine PFS results, which demonstrate highly attractive economics through the potential development of a low-cost, long-life copper and gold operation in a Tier-1 jurisdiction, supplied by 100% renewable power. The robust economic profile demonstrated by the PFS includes a pre-tax NPV7 of A$560 million, IRR of 22% and Life of Mine net cash flow of A$1,081 million. The estimated pre-production capital investment requirement is A$279 million, leveraging existing infrastructure, with a maximum cash draw of A$360 million. Average C1 costs of US$1.73/lb Cu (including by-product credits) are projected over the first 10 years of steady-state operations, and average life of mine C1 costs of US$1.89/lb Cu with the inclusion of the production ramp-up period. The PFS supports an initial 25-year mine life, producing 555kt of copper and 320koz of gold in concentrate over this period. The average annual production over the first 10 years post-ramp up is approximately 27kt of copper and 16koz |
Read More |