Announcement Date: | 2022-11-22 |
---|---|
Announcement Type: | Drilling Results |
Announcement Code: | NI43-101 |
Company name: | Dore Copper Mining Corp. |
Project name: | Corner Bay |
Location: | Canada |
Commodities: | Gold,Silver,Copper,Molybdenum |
Highlight: | Drilling results incl. 5.1m at 5.68% Cu, 0.32g/t Au, 18.3g/t Ag, 510ppm Mo from 1067.7m |
Resources: | only available to subscribers |
CP/QP: | only available to subscribers |
Announcement summary: | Toronto, Ontario – November 22, 2022 – Doré Copper Mining Corp. (the “Corporation” or “Doré Copper”) (TSXV: DCMC; OTCQX: DRCMF; FRA: DCM) is pleased to announce the final results from its 2022 drilling program on its flagship Corner Bay property, located in the Chibougamau mining camp, approximately 40 kilometers by road from Chibougamau, Québec. In 2022, Doré Copper has completed 44 holes totaling 38,405 meters and is reporting today the assay results from the last 12 holes. This drilling program is part of the feasibility study work to upgrade the Inferred Mineral Resource to the Indicated category. Another infill drilling program of approximately 2,000 meters is planned at Devlin for the first quarter of 2023. The drilling program which started in early 2022 is designed to infill the Corner Bay deposit at a 50 to 60 meter spacing from surface to a depth of 1,000 meters. From today’s results, 9 holes intersected the Main Vein above the dyke and the remaining 3 holes intersected the Main Vein below the dyke. The results are continuing to confirm the continuity of the copper mineralization for the Main Vein above and below the dyke (Figure 1 and Table 1). |
Read More |