| Announcement Date: | 2022-10-31 |
|---|---|
| Announcement Type: | Drilling Results |
| Announcement Code: | NI43-101 |
| Company name: | Western Alaska Minerals Corp. |
| Project name: | Waterpump Creek |
| Location: | United States |
| Commodities: | Silver,Lead,Zinc |
| Highlight: | Drilling results incl. 11.4m at 284g/t Ag, 14.8% Zn, 10.9% Pb from 166.6m |
| Resources: | only available to subscribers |
| CP/QP: | only available to subscribers |
| Announcement summary: | TUCSON, ARIZONA, US – October 31, 2022 – Western Alaska Minerals (the “Company” or “WAM”) is pleased to announce drill assay results from WPC22-20 which intersected two thick multistage massive sulfide horizons for which visuals were announced previously (See News Releases of August 2 and September 22, 2022) at its 100% owned Waterpump Creek Carbonate Replacement Deposit. The upper intercept cut 1.1 meters grading 883 grams/tonne (“g/t”) Silver (28.4 ounce/tonne (“oz/t”)), 45.2% Lead and 12.2% Zinc within 11.4 meters grading 284 g/t Silver (9.1 oz/t), 10.9% Lead and 14.8% Zinc. The lower intercept cut 2.7 meters grading 297 g/t Silver (9.5 oz/t), 10.6% Lead and 2.8% Zinc within 20.7 meters grading 171 g/t (5.5 oz/t) Silver, 5.8% Lead and 9.4% Zinc. The discussion below incorporates visual data from drillholes WPC22-21 and 22, for which assay data are pending, and from previous drill holes (See News Release of September 22, 2022). Mineralization remains open and will be the focus of the 2023 drill program. |
| Read More |