| Announcement Date: | 2022-10-17 |
|---|---|
| Announcement Type: | Drilling Results |
| Announcement Code: | NI43-101 |
| Company name: | First Energy Metals Ltd. |
| Project name: | Augustus |
| Location: | Canada |
| Commodities: | Lithium |
| Highlight: | Drilling results incl. 11.2m at 0.91% Li2O from 146m |
| Resources: | only available to subscribers |
| CP/QP: | only available to subscribers |
| Announcement summary: | VANCOUVER, BC, Oct. 17, 2022 /CNW/ – First Energy Metals Ltd. (CSE: FE) (“First Energy” or the “Company) is pleased to announce results of Phase 2 exploration program drill holes LC21-33 to 37 at its Augustus Lithium Property in Quebec, Canada. The drill hole LC21-35 intersected a 11.20-meter-wide zone with 0.91 percent (%) lithium oxide (Li2O) at 146 metres (m), including a 5 m zone with 1.03% Li2O at 146 m and 3.2 m with 1% Li2O at 154 m. This drill hole also has a lower seven meterswide zone with 0.54% Li2O at 165m drilled depth and several other smaller interceptswith variable lithium grades (see Table 2 for details). The drill hole LC21-35 intersected a 11.20-meter-wide zone with 0.91 % Li2O at 146 m, including a 5 m zone with 1.03% Li2O at 146 m and 3.2 m with 1% Li2O at 154 m. There is another seven meters wide zone with 0.54% Li2O at 165 m drilled depth including 2.06% Li2O over one meter at 169 m. This drill hole also intercepted several smaller intercepts with variable grades as shown in Table 2. |
| Read More |