| Announcement Date: | 2022-09-20 |
|---|---|
| Announcement Type: | Drilling Results |
| Announcement Code: | NI43-101 |
| Company name: | Burin Gold Corp. |
| Project name: | Hickeys Pond |
| Location: | Canada |
| Commodities: | Gold |
| Highlight: | Drilling results incl. 6m at 2.15g/t Au from 86m |
| Resources: | only available to subscribers |
| CP/QP: | only available to subscribers |
| Announcement summary: | Vancouver, Canada, September 20th, 2022 – Burin Gold Corp. (“Burin Gold” or the “Company”) (TSX-V: BURG) is pleased to announce gold assay results of 6.0 m of 2.15 g/t Au in the last hole drilled at Hickey’s Pond as part of the Company’s summer drill program as well as initial drill results from nine diamond drill holes at the Tower showing, both located on Burin Gold’s 100%-owned Hickey’s Pond – Paradise Gold Property in southeastern Newfoundland, Canada. Drill hole HP-22-030 was the final hole of the Company’s summer 2022 drill program at Hickey’s Pond and was planned to cross-cut hole HP-22-019 to better establish the true width of mineralisation intersected in that hole. A plan map is given in Figure 1, showing the drill collars and traces for all holes completed during the Company’s winter 2022 program, as well as the holes completed by the Company in its scout 2020 program. Table 1 lists a compilation of significant intercepts of all drilling completed in the Company’s 2022 drilling at Hickey’s Pond. Hole HP-22-030 intersected 7.20 m of 0.4 g/t Au from 23.30 m, 5.00 m of 0.48 g/t Au from 76.00 m, and 6.00 m of 2.15 g/t Au from 86.00 m, which included 1.00 m of 10.64 g/t Au from 88.00 m. Estimated true thickness of the intercept was 6.0 m. The Hickey’s Pond system has now been tested over 600 m of strike length, and drilling has intercepted broad zones of significant gold mineralisation |
| Read More |