Announcement Date: | 2022-07-11 |
---|---|
Announcement Type: | Drilling Results |
Announcement Code: | NI43-101 |
Company name: | Dore Copper Mining Corp. |
Project name: | Corner Bay |
Location: | Canada |
Commodities: | Gold,Silver,Copper,Molybdenum |
Highlight: | Drilling results incl. 10.9m @ 4.24% Cu, 0.62g/t Au, 15.2g/t Ag, 1226ppm Mo |
Resources: | only available to subscribers |
CP/QP: | only available to subscribers |
Announcement summary: | Toronto, Ontario – July 11th, 2022 – Doré Copper Mining Corp. (the “Corporation” or “Doré Copper”) (TSXV: DCMC; OTCQX: DRCMF; FRA: DCM) is pleased to announce the first set of results from its 2022 drilling program of 45,000 meters at its flagship Corner Bay property, located in the Chibougamau mining camp, approximately 40 kilometers by road from Chibougamau, Québec. As of July 4, 2022, Doré Copper has completed 32 holes totaling 33,900 meters and is reporting today the results from 13 holes. This drilling program is part of the feasibility study work to upgrade the Inferred Mineral Resource to the Indicated category. Another infill drilling program of approximately 2,000 meters is planned at Devlin. Drilling Highlights Main Vein above dyke The 2022 drilling program is designed to infill the Corner Bay deposit at a 50 to 60 meter spacing from surface to a depth of 1,000 meters and to potentially expand the higher grade copper zone in the Main Vein above the dyke. From today’s results, three holes intersected the Main Vein above the dyke and the remaining 10 holes intersected the Main Vein |
Read More |