Announcement Date: | 2022-05-11 |
---|---|
Announcement Type: | Drilling Results |
Announcement Code: | JORC |
Company name: | Auris Minerals Ltd. |
Project name: | Feather Cap |
Location: | Australia |
Commodities: | Gold |
Highlight: | Drilling results incl. 5m @ 0.6g/t Au from 100m |
Resources: | only available to subscribers |
CP/QP: | only available to subscribers |
Announcement summary: | Gold and Base Metals explorer Auris Minerals Limited (“Auris” or “the Company”) (ASX: AUR) is pleased to report gold and copper results returned from recently completed Air Core drilling at the Company’s Forrest Copper Project and the Feather Cap Gold Project in the Bryah Basin, Western Australia. FORREST PROJECT During March, a total of 60 Air Core drill holes were completed (FTAC0001-0060, Refer ASX Announcement 24 March 2022) for approximately 4,186m to further evaluate select regional targets located outside of the existing JORC resource, (Refer ASX Announcement 2 July 2021). An encouraging copper result of 5m @ 0.18% Cu from 45m was returned within FTAC0021 (refer Figure 1), north of the Forrest Resource. The drill hole was part of the drill line designed to initially evaluate IP Target 2, which is located 800m to the north of the Forrest Deposit. The copper mineralisation within FTAC0021 is associated with sediments of the Robinson Range Formation and remains open to the north and south for 500 metres. Additional encouraging copper results were returned within drill holes, FTAC0037 and FTAC0038, comprising 5m @ 0.12% Cu from 55m and 9m @ 0.11% Cu from 36m respectively. Both copper intersections are also associated with Robinson Range Formation sediments, located 200m along strike to the south of previously returned mineralisation within drilling of 8m @ 0.20% Cu from 45m, (WRAC182). |
Read More |