Announcement Date: | 2022-04-12 |
---|---|
Announcement Type: | Drilling Results |
Announcement Code: | JORC |
Company name: | Green Technology Metals Ltd. |
Project name: | Seymour |
Location: | Canada |
Commodities: | Lithium |
Highlight: | Drilling results incl. 34.3m @ 1.32% Li2O from 244.0m |
Resources: | only available to subscribers |
CP/QP: | only available to subscribers |
Announcement summary: | Green Technology Metals Limited (ASX: GT1) (GT1 or the Company) is pleased to provide further assay results from the Phase 1 diamond drilling program at its Seymour Lithium Project in Ontario, Canada. The Phase 1 drilling program at Seymour was designed to evaluate potential along-strike and down-dip extensions of the North Aubry deposit that were open and untested. This maiden program is complete with 16 holes having been drilled for a total of 5,826 metres. All holes in the Phase 1 program intersected pegmatite along strike and down dip (refer GT1 ASX releases dated 8 March 2022 and 17 March 2022). The intercepts returned from solely the upper pegmatite at North Aubry range in thickness up to 42.7m, with the widest intervals located in the northern extensions of the deposit. Assays have now been returned for 9 of the 16 holes from the Phase 1 program. Results from the first three holes in the program have been previously released, returning key mineralised intervals of 42.7m at 1.54% Li2O (GTDD-21-0004), 8.9m at 1.46% Li2O (GTDD-22-0005) and 1.58m at 1.11% Li2O (GTDD-22-0006) (refer GT1 ASX releases dated 17 January 2022 and 8 March 2022 for full details). |
Read More |