Announcement Date: | 2022-04-12 |
---|---|
Announcement Type: | Optimisation Study |
Announcement Code: | JORC |
Company name: | Breaker Resources NL |
Project name: | Lake Roe |
Location: | Australia |
Commodities: | Gold |
Highlight: | Optimisation study for Lake Roe |
Resources: | only available to subscribers |
CP/QP: | only available to subscribers |
Announcement summary: | Breaker Resources NL (ASX: BRB; Breaker or the Company) is pleased to confirm positive outcomes from an open pit optimisation study (the Study) targeting the Bombora-Claypan gold deposits situated within its 1.7Moz Lake Roe Gold Project# following the 20 December 2021 Mineral update (Table 1; Figure 1). The objectives of the Study are to Bombora is a virgin discovery with no mining legacy issues, is a typical Archean (stratabound) multi-lode deposit hosted by fractionated dolerite. The Company’s objective at Lake Roe is to develop a standalone open pit and underground mine based initially on the Bombora gold deposit, while concurrently stepping up its drilling to keep growing the 9km-long gold system and further expand its development options. Preliminary underground mining studies are now underway and will initially focus on the high-grade Tura lode and the 2.2km-long array of high-grade flat lodes discovered below the open pit Resource over the last year. |
Read More |