| Announcement Date: | 2022-03-28 |
|---|---|
| Announcement Type: | Drilling Results |
| Announcement Code: | NI43-101 |
| Company name: | Orezone Gold Corp. |
| Project name: | Bombore |
| Location: | Burkina Faso |
| Commodities: | Gold |
| Highlight: | Drilling results incl. 21m @ 3.1g/t Au from 123m |
| Resources: | only available to subscribers |
| CP/QP: | only available to subscribers |
| Announcement summary: | March 28, 2022 – Vancouver, BC – Orezone Gold Corporation (TSX: ORE, OTCQX: ORZCF) (the “Company” or “Orezone”) is pleased to provide drill results from the final three holes of the Phase II program at P17SNE extension along the P17 mineralized trend at the Bomboré Gold Project, located in Burkina Faso. The Phase II program is a follow up to Phase I (completed in June 2021) which intersected several high-grade zones associated with folded mineralized granodiorite that extends outside of the existing reserves at P17S-NE. These three holes returned thick high-grade mineralization within a shoot that remains open both up and down plunge and provides further confirmation of the continuity of mineralization of the P17S-NE zone. Drilling has now moved approximately one kilometer to the north of the P17S-NE extension to P17 (see Figure 1). P17 was first drilled in the 1990’s and several high-grade intercepts were identified near surface between 2006 and 2013 when the most recent drill program was completed. Fourteen holes are planned for P17 to advance the definition of this deposit and better delineate its folding pattern while exploring for potential extensions at depth and towardsthe P17S deposit, along the 1.8-kilometer mineralized trend that encompass these deposits. |
| Read More |