Announcement Date: | 2022-03-22 |
---|---|
Announcement Type: | Drilling Results |
Announcement Code: | NI43-101 |
Company name: | Imperial Metals Corp. |
Project name: | Red Chris |
Location: | Canada |
Commodities: | Gold,Copper |
Highlight: | Drilling results incl. 364m @ 0.31% Cu, 0.29g/t Au from 120m |
Resources: | only available to subscribers |
CP/QP: | only available to subscribers |
Announcement summary: | Vancouver | March 22, 2022 | Imperial Metals Corporation (the “Company”) (TSX:III) reports that eight drill rigs are now operating at Red Chris with five focusing on East Ridge exploration and three gathering geotechnical information for infrastructure related to the development of a block cave. Hole RC750W was drilled in the East Ridge zone. The East Ridge zone is outside of the current Mineral Resource estimate. Hole RC750W, which is located approximately 100 metres beneath RC739, intercepted 166 metres of 0.33% copper and 0.26 g/t gold from 1194 metres and 96 metres of 0.61% copper and 0.77 g/t gold from 1454 metres including 46 metres of 1.0% copper and 1.3 g/t gold from 1502 metres. Hole RC750W also intercepted 82 metres of 0.61% copper and 0.69g/t gold from 1578 metres. Drill holes RC753, RC765 and RC775 were collared at the western edge of the Main Zone pit and continue to expand the Main Zone mineralization west towards the Gully Zone. All three holes intersected wide zones of mineralization, with RC753 hitting 364 metres of 0.31% copper and 0.29 g/t gold beginning at a relatively shallow depth of 108 metres from surface. Results from RC765 include |
Read More |