| Announcement Date: | 2022-03-22 |
|---|---|
| Announcement Type: | Drilling Results |
| Announcement Code: | NI43-101 |
| Company name: | White Metal Resources Corp. |
| Project name: | Tower Mountain |
| Location: | Canada |
| Commodities: | Gold |
| Highlight: | Drilling results incl. 1.5m @ 27.2g/t Au from 14.0m |
| Resources: | only available to subscribers |
| CP/QP: | only available to subscribers |
| Announcement summary: | Thunder Bay, Ontario March 22, 2022: White Metal Resources Corp. (TSXV: WHM) (FRA: CGK1) (OTCMKTS: TNMLF) (“White Metal” or the “Company”) is pleased to announce that it has received additional drill core assay results from its recently completed Phase 3 drilling program at its flagship Tower Mountain Gold Project (the “Project” or “Property”), located about 50 km west-northwest of the port city of Thunder Bay, Ontario. Results from the drilling program extended the A Zone by 25 m down-dip and results from C&M Zone suggest a possible link to alteration and gold mineralization located in the areas of the D and 110 zones, extending the strike more than 700 m to the west (Figure 1). The Company is very pleased with the results to date as it continues to identify low-grade gold over long core intervals and high-grade gold over narrower core intervals. Much more drilling is required to evaluate the full potential and scale of the D, 110, C&M and A zones, as well as numerous other zones and surface showings. The Phase 3 drilling program was successful in testing the multitude of gold zones, expanding the potential of the Bench Zone, and in-fill drilling between holes TM-21-120 and TM-21-121, which had significant gold grades over substantial core |
| Read More |