Announcement Date: | 2022-03-22 |
---|---|
Announcement Type: | Drilling Results |
Announcement Code: | NI43-101 |
Company name: | QuestEx Gold & Copper Ltd. |
Project name: | KSP Property |
Location: | Canada |
Commodities: | Gold,Silver,Copper,Zinc |
Highlight: | Drilling results incl. 90.0m @ 1.92g/t Au, 6.1g/t Ag, 0.116% Zn, 0.039% Cu from 127.0m |
Resources: | only available to subscribers |
CP/QP: | only available to subscribers |
Announcement summary: | Vancouver, British Columbia / March 22, 2022. QuestEx Gold & Copper Ltd. (TSX-V: QEX; OTCQX: QEXGF) (“QuestEx” or the “Company”), is pleased to announce the final round of 2021 drill results from the Inel gold prospect on its 100% owned, 312 square kilometre (“km”), road accessible KSP property in British Columbia’s prolific Golden Triangle district. Joe Mullin, QuestEx CEO comments: “Our 2021 drill program has continued to yield impressive results at the Inel target on the KSP property. These drill results from the final holes of our program combined with the earlier drill results from this and past seasons will contribute to an inaugural resource estimate on the Inel gold prospect later this Spring.” Results from the last 7 of 13 drill holes completed in 2021 at Inel (Figure 1) are infill resource expansion holes targeting higher gold (“Au”) grades to the southeast on Inel Ridge, and peripheral expansion drilling to the north near the AK Adit. Final assays are now validated for inclusion within an anticipated inaugural National Instrument (“NI”) 43-101 Mineral Resource Estimate that QuestEx expects to announce in Spring 2022. Inel Ridge is one of several domains characterized by locally high-grade gold, silver (“Ag”) and zinc (“Zn”) within broad intervals of repeating, quartz-carbonate-sulphide vein sets that occur as shear and extension arrays and have the potential to occupy large rock volumes. Drilling in 2021 at Inel Ridge consisted |
Read More |