| Announcement Date: | 2022-02-15 |
|---|---|
| Announcement Type: | Drilling Results |
| Announcement Code: | NI43-101 |
| Company name: | Sabre Gold Mines Corp. |
| Project name: | Copperstone |
| Location: | United States |
| Commodities: | Gold |
| Highlight: | Drilling results incl. 6.0m @ 13.4g/t Au from 10.7m |
| Resources: | only available to subscribers |
| CP/QP: | only available to subscribers |
| Announcement summary: | Vancouver, British Columbia, Canada – February 15, 2022 – Sabre Gold Mines Corp. (TSX: SGLD, OTCQB: SGLDF) (“Sabre Gold” or the “Company”) is pleased to announce positive underground drilling results at its 100% owned Copperstone gold project located in Arizona, United States. Mike Maslowski, Vice President of Technical Services and Exploration of Sabre Gold stated: “The initial assay results from our in-fill drill program, designed to provide detailed geologic information for final stope planning and design have been received. Drill results are showing very good continuity of the mineralized shear zone and gold grades while adding further confidence to our resource model and detailed mine plan.” The underground core and reverse circulation (“RC”) drill programs, conducted in two phases is now completed with further assays pending. Core drilling was conducted in 2021 and previously reported. The RC drilling was conducted during the period October to December with partial assays results having been received. The RC program consisted of 85 holes for a total of 3,004 meters. The core and RC drilling targeted both the C and D Zones where the initial mining at Copperstone is scheduled to commence. Drill holes were designed to drill sections of the planned mining areas at close spacings of approximately 6.5 meters |
| Read More |