| Announcement Date: | 2021-12-07 |
|---|---|
| Announcement Type: | Exploration Update |
| Announcement Code: | JORC |
| Company name: | Thor Mining Plc |
| Project name: | Molyhil |
| Location: | Australia |
| Commodities: | Copper,Iron,Molybdenum,Tungsten |
| Highlight: | Disseminated scheelite-molybdenite-chalcopyrite mineralisation intercepted in drilling |
| Resources: | only available to subscribers |
| CP/QP: | only available to subscribers |
| Announcement summary: | The Directors of Thor Mining Plc (“Thor” or the “Company”) (AIM, ASX: THR, OTCQB: THORF) are pleased to announce that the third follow up diamond drillhole (21MHDD003) at the Molyhil Critical Minerals Project, Northern Territory, reinforces the newly discovered extension of scheelite-molybdenite-chalcopyrite mineralisation within a magnetite skarn. Three diamond drillholes (21MHDD001 – 21MHDD003) totalling 995.4m have been successfully tested, and confirmed the newly identified magnetic target, which represents a massive magnetite skarn hosting disseminated tungsten-molybdenumcopper mineralisation, located to the south of the Molyhil Critical Minerals Project (Table A and B and Figure 1 and 2). Both 21MHDD002 and 21MHDD003 intercepted disseminated mineralisation, consisting of scheelite-molybdenite and chalcopyrite within massive magnetite skarn. Drillhole 21MHDD002 intercepted over 45m of disseminated mineralisation (Photo 2 and 4), whilst 21MHDD003 intercepted two zones over 29m of disseminated mineralisation (Photo 1 and 3) |
| Read More |