| Announcement Date: | 2021-11-22 |
|---|---|
| Announcement Type: | Drilling Results |
| Announcement Code: | NI43-101 |
| Company name: | Trilogy Metals Inc. |
| Project name: | Arctic |
| Location: | United States |
| Commodities: | Gold,Silver,Copper,Lead,Zinc |
| Highlight: | Drilling results incl. 24.94m @ 1.85% Cu, 2.96% Zn, 0.57% Pb, 27.09g/t Ag, 0.28g/t Au from 71.93m |
| Resources: | only available to subscribers |
| CP/QP: | only available to subscribers |
| Announcement summary: | November 22, 2021 – Vancouver, British Columbia – Trilogy Metals Inc. (TSX, NYSE American: TMQ) (“Trilogy” or the “Company”) is pleased to announce the first drilling results from the 2021 summer field season at the Arctic Project, part of the Upper Kobuk Mineral Projects (“UKMP”) located in Northwestern Alaska managed by Ambler Metals LLC (“Ambler Metals”), the joint venture operating company equally owned by Trilogy and South32 Limited (ASX, LSE, JSE: S32; ADR: SOUHY) (“South32”). The 2021 Arctic field program included 4,131 meters of diamond drilling, comprising 18 holes, that were designed to convert a portion of the resources from the Indicated category to the Measured category, and provide material for metallurgical testing and geotechnical information. The results contained in this news release are from the first two geotechnical holes of the program that were drilled at the start of the field season. The results of the remaining 16 holes are expected to come in over the next couple of months. Highlights from the first two holes of the 2021 drill program Drill holes AR21-0173 and AR21-0175 were drilled as part of the 2021 geotechnical program that is designed to test the northeast pit’s wall stability. Both holes show that high grade mineralization extends beyond the currently defined pit at Arctic. |
| Read More |